• Home
  • About Us
    • Firm Profile
    • Monika F. Kuhnau, AIA
    • Alan E. Gozart, AIA
    • Aaron Gozart
    • Tanner Venturi
    • Carrie Hubbard
  • Portfolio
    • Educational Projects
    • Municipal Projects
    • Commercial Projects
    • Residential Project Information
  • Projects Bidding
    • Current Bidding Projects
  • Contact
City of Aberdeen - Aberdeen Police Station Breakroom Improvements

BID RESULTS

Plans & Specs are made available here for the convenience of Contractors and SubContractors who are bidding on the project.  If you have any questions, please email Carrie or contact us. These drawings & specs have been converted into Adobe .pdf documents.  You will need the free Adobe Acrobat reader to view and print them.  If you do not already have the Acrobat Reader, you can download it for free here:https://get.adobe.com/reader/
If you download plans, please let us know so we can add you to the Planholders List.  This allows you to receive updates and Addenda in a timely manner.  Email Carrie to be added to the list.
Project Description
WORK INCLUDEDProvide all labor, materials and equipment required to complete all the Work under a single, lump sum contract for Maintenance Building Remodel, located at 210 E. Market St., Aberdeen, Washington, as shown on the Drawings and described in the Project Manual. Items of the Work include, but are not limited to:1. Replace existing flooring with new LVL flooring and rubber base.2. Replace existing casework with new casework & countertops.
WORK NOT INCLUDEDThe following items of work will be performed by others, under separate contract, and are not included in this Contract. The Contractor is responsible for storing, if requested, separate contract equipment. The Contractor is responsible for coordinating related work of the Contract with separate contract work. The Contractor shall provide all preparatory work necessary for proper installation of separate contract items including: blocking and backing, and shall provide all finish work necessary for proper installation of separate contract items including: caulking, grouting, furring and painting adjacent surfaces.1. Moving furniture and equipment, unless shown otherwise.2. All other items shown on the Drawings and/or described in the Project Manual as “NIC” (not in contract).
BIDDING INFORMATION
  • Last Updated  10/29/2024
  • ADDENDUM NUMBER THREE - 10.29.24
  • ADDENDUM NUMBER TWO - 10.28.24
  • ADDENDUM NUMBER ONE - 10.21.24
  • Advertisement
  • Substitution Request Form
  • Plan Holders List
DRAWING SHEETS
  • A210 - Key & Floor Plans, Int. Elevations & Notes
PROJECT MANUAL
  • Complete Project Manual
  • Bid Form*​
* The Bid Form has been designed so that it can be filled out in your Acrobat Reader program.
HARBOR ARCHITECTS LLC 345 W Wishkah Street Aberdeen, WA 98520
(360) 532-0980 info@harborarchitects.com ©1999-2023 Harbor Architects LLC

We use cookies to enable essential functionality on our website, and analyze website traffic. By clicking Accept you consent to our use of cookies. Read about how we use cookies.

Your Cookie Settings

We use cookies to enable essential functionality on our website, and analyze website traffic. Read about how we use cookies.

Cookie Categories
Essential

These cookies are strictly necessary to provide you with services available through our websites. You cannot refuse these cookies without impacting how our websites function. You can block or delete them by changing your browser settings, as described under the heading "Managing cookies" in the Privacy and Cookies Policy.

Analytics

These cookies collect information that is used in aggregate form to help us understand how our websites are being used or how effective our marketing campaigns are.