• Home
  • About Us
    • Firm Profile
    • Monika F. Kuhnau, AIA
    • Aaron Gozart
    • Tanner Venturi
    • Carrie Hubbard
  • Portfolio
    • Educational Projects
    • Municipal Projects
    • Commercial Projects
    • Residential Project Information
  • Projects Bidding
    • Current Bidding Projects
    • Elma Middle School Roof Replacement
    • Wishkah School District - Gym Remodel
  • Contact
  • Hiring Notice
Wishkah Valley District No. 117 - Old Gym Improvements
Click HERE for Bid Results
Plans & Specs are made available here for the convenience of Contractors and SubContractors who are bidding on the project.  If you have any questions, please email Carrie or contact us. These drawings & specs have been converted into Adobe .pdf documents.  You will need the free Adobe Acrobat reader to view and print them.  If you do not already have the Acrobat Reader, you can download it for free here:https://get.adobe.com/reader/
If you download plans, please let us know so we can add you to the Planholders List.  This allows you to receive updates and Addenda in a timely manner.  Email Carrie to be added to the list.
  • There will be a virtual option for viewing the bid opening starting at 3:00 pm on September 17th. Bids must still be delivered as outlined in the advertisement, but the opening may be viewed via zoom with the information below: Zoom Link - 24-16 Wishkah Valley District 117 - Old Gym Remodel - Bid Opening Live
  • Meeting ID: 816 5323 6336 Passcode: 478808
Project Description
The Project includes the following work: Remodel of the 4,875 Square Foot Old Gym in the following areas: Reside and Re Roof, Foundation Retrofit and Connection to Structure, Access ramp/Porch replacement, HVAC and Building Envelope upgrades. Project Estimate: $980,000 (not including sales tax)
Hazardous Materials Investigation - KD&S Environmental - January 13, 2025
Project Contacts

Owner

Wishkah Valley District No. 117Rich Rasanen, Superintendent4640 Wishkah RoadAberdeen, WA 98520(360) 532-3128

Owner's Representative

Vector Engineering, Inc.Ryan Moore PE, Project Manager2724 Black Lake Blvd SW, Suite 202Tumwater, WA 98512(360) 352-2477

Architect

Harbor Architects LLCMonika Kuhnau AIA, Project Architect345 W Wishkah StreetAberdeen, WA 98520(360) 532-0980
BIDDING INFORMATION
  • Last Updated  09/16/2025
  • ADDENDUM ONE 09.12.25
  • Advertisement
  • Substitution Request Form
  • Plan Holders List
DRAWING SHEETS
GENERAL
  • Complete Drawing Set
  • A001 Project Info, Project Team, Drawing Index, Code & Other Info
  • CD01 ADA Code Details
  • CD02 ADA Code Details
ARCHITECTURAL SHEETS
  • A110 Demo Plan & Notes
  • A200 Foundation Plan & Notes
  • A201 Floor Framing Plan & Notes
  • A202 Roof Framing Plan & Notes
  • A203 Foundation Details
  • A210 Main Floor Plan & Notes
  • A211 Ramp Framing Plans, Details & Notes
  • A212 Details
  • A300 Interior Elevations & Notes
  • A310 Window Schedule, Details & Notes
  • A311 Door & Frame Schedule, room Finish Schedule, Details & Notes
  • A400 Elevations & Notes
  • A401 Elevations & Notes
  • A500 Building Sections
  • A501 Building Sections
STRUCTURAL
  • S100 General Notes
  • S101 General Notes
  • S102 General Notes
  • S103 General Notes
MECHANICAL
  • M0.00 HVAC Legend, Abbreviations & General Notes
  • M1.01D First Floor HVAC Demo Plan
  • M1.01 First Floor HVAC Plan
  • M4.01 Equipment Room Section
  • M5.01 HVAC Details
  • M6.01 HVAC Schedules
  • M7.01 HVAC Control Diagrams and Seq of Operations
ELECTRICAL
  • E0.00 Electrical Legend, Abbreviations & General Notes
  • E1.01 First Floor Power Plan
  • E2.01 First Floor Lighting Plan
  • E4.01 First Floor IT & Security Plan
  • E5.01 Electrical Details
  • E6.01 Electrical Schedules
PLUMBING
  • P0.00 Plumbing Legend, Abbreviations & General Notes
  • P1.01D First Floor Plumbing Demo Plans
  • P1.00 Underground Plumbing Plan
  • P1.01 First Floor Plumbing Plans
  • P5.01 Plumbing Details
  • P6.01 Plumbing Schedules
FIRE ALARM
  • FA0.00 Fire Alarm Legend & General Notes
  • FA1.01 First Floor Fire Alarm Plan
  • FA5.01 Fire Alarm Devices Mounting Heights
  • FA8.01 Fire Alarm Schematic Diagram
PROJECT MANUAL
  • Complete Project Manual
  • Bid Form*​
* The Bid Form has been designed so that it can be filled out in your Acrobat Reader program.
HARBOR ARCHITECTS LLC 345 W Wishkah Street Aberdeen, WA 98520
(360) 532-0980 info@harborarchitects.com ©1999-2023 Harbor Architects LLC

We use cookies to enable essential functionality on our website, and analyze website traffic. By clicking Accept you consent to our use of cookies. Read about how we use cookies.

Your Cookie Settings

We use cookies to enable essential functionality on our website, and analyze website traffic. Read about how we use cookies.

Cookie Categories
Essential

These cookies are strictly necessary to provide you with services available through our websites. You cannot refuse these cookies without impacting how our websites function. You can block or delete them by changing your browser settings, as described under the heading "Managing cookies" in the Privacy and Cookies Policy.

Analytics

These cookies collect information that is used in aggregate form to help us understand how our websites are being used or how effective our marketing campaigns are.