Grays Harbor Transit - Maintenance Building Remodel
Plans & Specs are made available here for the convenience of Contractors and SubContractors who are bidding on the project. If you have any questions, please email Carrie or contact us.
These drawings & specs have been converted into Adobe .pdf documents. You will need the free Adobe Acrobat reader to view and print them. If you do not already have the Acrobat Reader, you can download it for free here:https://get.adobe.com/reader/
If you download plans, please let us know so we can add you to the Planholders List. This allows you to receive updates and Addenda in a timely manner. Email Carrie to be added to the list.
If you download plans, please let us know so we can add you to the Planholders List. This allows you to receive updates and Addenda in a timely manner. Email Carrie to be added to the list.
Project Description
- Interior remodel of wood frame structure including addition of restroom facility.
- Estimate range - $621,000 to $685,000
- WORK INCLUDED
- Provide all labor, materials and equipment required to complete all the Work under a single, lump sum contract for Maintenance Building Remodel, located at 705 30th Street, Hoquiam, Washington, as shown on the Drawings and described in the Project Manual. Items of the Work include, but are not limited to:
- 1. Relocate Dispatch area to former Meeting Room.
- 2. Expand driver’s lounge into former Dispatch area.
- 3. Convert existing Work Room to restroom facility with (2) standard private toilet stalls, (1) accessible private toilet stall, and common lavatory area.
- 4. Create File Room on upper floor.
- 5. Remove and relocate existing tackboards and whiteboards and reinstall as directed by Owner.
- 6. Asbestos abatement.
WORK NOT INCLUDEDThe following items of work will be performed by others, under separate contract, and are not included in this Contract. The Contractor is responsible for storing, if requested, separate contract equipment. The Contractor is responsible for coordinating related work of the Contract with separate contract work. The Contractor shall provide all preparatory work necessary for proper installation of separate contract items including: blocking and backing, and shall provide all finish work necessary for proper installation of separate contract items including: caulking, grouting, furring and painting adjacent surfaces.1. Privacy screen in Hall-121.2. Radio equipment and associated 3. Voice/data cabling and all terminations.4. Moving furniture and equipment, unless shown otherwise.5. All other items shown on the Drawings and/or described in the Project Manual as “NIC” (not in contract).
BIDDING INFORMATION
DRAWING SHEETS
- Complete Drawing Set
- A001 - Project Information, Project Team, Drawing Index, Code Information, Maps & Other Information
- A200 - Demolition Floor Plans & Notes
- A210 - Floor Plans, Interior Elevation, Wall Section & Notes
- A300 - Room Finish Schedule, Interior Elevations & Notes
- A310 - Door & Frame Schedule & Details
- E210 - Schematic Lighting Floor Plans & Notes
- E211 - Schematic Electrical Floor Plans & Notes
PROJECT MANUAL
* The Bid Form has been designed so that it can be filled out in your Acrobat Reader program.